01. After the steel frame manufacturing is completed at the steel frame manufacturing site, the steel frame installation is completed using crane equipment, and the steel frame parking lot flooring are lifted in consideration of the direction of the flooring for each area
Steel installation01
Steel installation02
Steel installation03
Parking lot flooring double-weighted
Parking lot flooring
02.The lifted steel parking lot flooring are spreaded out one by one on the upper part of the steel frame, and the parking lot flooring are welded to the steel frame and the lower part of the flooring to bond.
Installation of flooring double-duty01
Installation of flooring double-duty02
Installation of flooring double-duty03
03.After completing the lower welding, mark the upper welding construction area at regular intervals using measuring line and weld the marked area
04. Touch-up (Zinc Melting Plated Repair Material) to prevent rust in the welded area after completion of the upper welding construction of the steel parking lot flooring
Galvanized Check Iron Plate 3.2T
1st Floor Flooring + Galvanized Check 3.2T
1st Floor Flooring + Galvanized Check 3.2T
Iron plate 3.2 thickness 3mm tape welding
05. After constructing the flooring of the steel parking lot, cover it with the galvanized steel plate or check plate by welding for waterproofing basically
Galvanized Check Iron Plate Full Welding
Galvanized check iron plate non-finishing material
06. After covering, the galvanized steel plate can be finished with a touch-up (plating repair material) on the welding part and can be finished with epoxy paint when constructing the check plate.
Parking Line + Castor
Induction Indication